Using a rotophase
Details
Chapters
Quizzes
333 views
Add the 14/03/2017

6 steps for using a rotophase.

(00:11) Equipment
(00:28) Checks: Helmet: validity date, operation of the visor
(00:45) Checks: Gloves: validity date & physical integrity
(01:01) Rotophase: connected according to colour code
(01:55) Preparation: placement of insulating mat and marking out of the work area
(02:02) Action: connect the cables to the terminals of the installation to be checked
(02:31) Action: check the direction of rotation in order to rewire correctly
(02:39) End of the operation

How many leads are connected to the terminals of the installation to be tested?

More
Installation of a 5m column

Find here all the steps for the installation of a 5 metre column.

312 Views • 1 year and a half ago

Operating the Wacker Neuson rebar tier

Follow the steps for a precise and methodical operation of the Wacker Neuson rebar tier.

656 Views • 1 year and a half ago

DETECTION OF EXISTING GAS NETWORK NETWORK WITH RD 8000

Here is the procedure to detect a copper connection in the secondary part in order to be able to create a trench.

336 Views • 2 years ago

frFrançais
enEnglish
deDeutsch
Subscribe to the newsletter
By indicating your e-mail address above, you agree to receive our commercial proposals electronically. You can unsubscribe at any time via the unsubscribe link in our newsletter.
Operating instructions

During your search, you can:

Also consider activating the sound on your device.

On mobile devices, note that you will need to start the video manually.

Excellent search!

Close
Tutorials
Close
Suggest a topic
By submitting this form, I agree that the information entered may be used within the framework of my topic proposal.
Contact
By submitting this form, I agree that the information entered may be used as part of my contact request.
Search for a video